# Programmer review — deterministic historical calendar Code verdict: **ACCEPTED for scoped source change**, pending new candidate/full-build/release evidence. Reviewed working diff against2d5a687 plus complete new `web/lib/dates.mjs` and `web/scripts/check-dates.mjs`. Shared formatter explicitly pins UTC; article/index imports use its reexport, client catalog imports the same helper with its existing short style. A source search found no other publication-date formatter in app/lib. No ISO timestamp, historical URL or article-body edit is introduced by this fix. The UTC choice is supported by content-manager's per-record raw-source ledger: it preserves the calendar label historically printed with the explicit+00:00 metadata and dated path; it does not infer an author's geographical timezone. Test meaning: check-dates.mjs hardcodes three independent historical expected labels for late-evening instants that shift to the next day under Moscow defaults. It starts actual Node child processes under UTC and Europe/Moscow, verifies each process's resolved timezone, and compares long/short outputs to those historical expected strings. It runs before every production build. Independently ran this regression successfully. This verifies the previous real failure mode, not just equality with a value recomputed by the function under test. Additional independent checks in formatter-checks.json cover all14 records under four actual process defaults (UTC, Europe/Moscow, America/Los_Angeles, Asia/Tokyo):56 date calendars match content-manager's fixed expected Russian long labels (ignoring only the optional leading zero of a two-digit day); exact long and short results are identical across defaults; full datetime strings and legacy paths equal the source ledger. This supplements the committed3-fixture regression without adding product changes. **Release verification remains PENDING.** The previous frozen656da6 build is not the revised source/build identity; source changes require a new frozen candidate. Full UTC/Moscow builds must compare every generated publication time/metadata/legacy route across81 HTML, then new deployed source/revision/healthy state and actual public dates must be checked. Do not transfer old frozen full-HTML parity to the revised build. Prior bodies/media equality remains limited to the unchanged artifacts actually compared. Mandatory Semrush/expanded research webprogcode-v2.6 remains open; no full-restoration PASS. Harness note: the first independent56-case comparison stopped on `04 августа` versus ledger `4 августа`, a presentation-width difference rather than a calendar failure. Corrected only the reviewer comparison to ignore a leading zero in day; the successful56-case result is stored. Product code was not changed. ## New immutable candidate independently verified Commit0cb1ce1f150a8361e6479843c9b0701701871baf contains only the reviewed formatter/import/regression/build-command change and new identity. Independently recomputed source identity from167 committed blobs:f4aa72d3c1fed6b79fbf0cdc0ebc815313b48272d905369e8d0ae5c91771a6e5. Independently hashed all680 frozen output files by sorted relative-path bytes then file bytes:3bb33db05c55c1fba415dffcd8df509603b970b349f90fbaab3fd2c93092d7c9. Both match candidate records. Parsed all81 HTML files in `/tmp/progcode-dates-utc-out` and `/tmp/progcode-v2-frozen-f4aa72d3c1fe`: all146 datetime/text pairs are identical across builds, and each matches the independent historical calendar ledger (long/short style and optional day leading-zero accounted for). Every14 canonical header and14 dated legacy header preserves the original complete ISO value and expected historical printed day. Own results:frozen-calendar-review.json. No full-HTML byte equality across builds is asserted. The old656 frozen is explicitly superseded for visible calendar parity. Source code and new frozen-calendar candidate are accepted. Release remains pending actual0cb1ce1 runtime/revision/TLS/public-time verification. Semrush6 remains open. ## Scoped calendar release verdict — ACCEPTED Independently verified live production after CI141 release: actual zz service update completed, desired immutable image `git.pryanik.synology.me/huncode/progcode:0cb1ce1f150a@sha256:1bc872de4b191106ae8748d98a211d6e79742b6d7a5bff4fef5ebf0d15015c2e`, actual container4f40856c7279 healthy with zero failing streak and OCI revision0cb1ce1f150a8361e6479843c9b0701701871baf. Own selected SSH results in runtime-ssh.txt. Independently fetched publication identity using standard CA/hostname verification for apex and www through normal public DNS and separately through forced origin77.91.88.137 with correct SNI/Host: all4 checks HTTP200, new sourcef4aa72d3c1fed6b79fbf0cdc0ebc815313b48272d905369e8d0ae5c91771a6e5. Independently fetched every14 canonical and14 dated legacy article: all28 publication labels/complete datetime metadata match the source-reviewed historical ledger and the NEWf4aa72 frozen output. Own actual public evidence in public-calendar.json. No old656 frozen was used for this comparison. Read the coordinator's actual new public81-page main-text/head-metadata/date comparison and complete production crawl. It records146 time elements,14 bodies and11 visuals matching NEWf4aa72, no missing targets. Read and validated actual public-browser UTC/Moscow records in `/tmp/progcode-calendar-browser-public.json`:14 home labels and all3 late-evening boundary article labels are identical under the two actual browser timezone settings; both report sourcef4aa72 and no errors. This complements, rather than substitutes for, my independent28-header HTTP comparison and4-host-transport TLS checks. The host-timezone publication-calendar defect is resolved; source/frozen/release evidence is now about0cb1ce1/f4aa72, not an automatic carry-over of656 fullHTML parity. No further app/deploy edit is requested by this reviewer. Mandatory expanded research webprogcode-v2.6 and coordinator full-restoration acceptance remain open; this scoped release verdict does not close them. The reconciliation of a known replytocom24 spam comment is documentation/discovery evidence and does not establish completeness of the uninspected Semrush scope.